Wire the strands-typescript showcase integration for staging deployment,
mirroring how the Python strands integration is deployed.
- manifest: flip deployed: true so the shell lists it in the integration menu
- railway-envs.ts: add showcase-strands-typescript SSOT entry (staging-only
for now: prod instance not yet provisioned, so it omits the prod env and is
gateIgnore'd until promoted dual-env); regenerate railway-envs.generated.json
- showcase_build.yml + showcase_build_check.yml: add the strands-typescript
build matrix entry, change-detection filter, and dispatch option (railway_id
is the new Railway service id)
- golden fixture + image-ref-gate inventory tests updated for the new service
Railway staging service showcase-strands-typescript provisioned
(showcase-strands-typescript-staging.up.railway.app, health /api/health,
OpenAI-via-aimock env). Prod is added later via the promote pipeline.
The pool-fleet migration is complete: the control-plane harness plus the
prod workers (deployed 2026-06-19, HARNESS_ROLE=worker, pool count 2) now
cover every probe dimension the interim `harness-legacy` fleet-migration
bridge was holding live, so `harness-legacy` is dead config.
This is the code-side cleanup only:
- Remove the `harness-legacy` entry from the railway-envs SSOT and the
now-dead `key === "harness-legacy"` special-case in computePromoteClosure.
- Regenerate railway-envs.generated.json (41 -> 40 services).
- Drop harness-legacy from the golden snapshot, the gateIgnore expectation
sets, the promote-notify fixtures, and the redeploy-env doc comments;
update the service-count assertions (41 -> 40).
- Fix the stale "STAGING-ONLY" harness-workers comment: prod workers are
live on Railway, though this SSOT entry still models the staging
instance only (no prod env backfilled here yet).
The live Railway `harness-legacy` service is torn down separately as a
follow-up infra step.
The showcase_build verify-image-refs gate (SSOT = showcase/scripts/railway-envs.ts)
was failing with "1 untracked Railway services" because the interim
harness-legacy staging service (the legacy all-probe harness kept live during
the pool-fleet migration) exists on Railway but had no SSOT entry. That
Railway->SSOT drift check skips the build, so nothing deploys.
Adds a harness-legacy SERVICES entry mirroring the showcase-harness-worker
precedent (PR #5280): ciBuilt:false (not built by showcase_build, runs a pinned
out-of-band digest) and gateIgnore:true (deliberately-untracked for the image-ref
gate). findUntrackedServices treats any SSOT entry as known, so this clears the
untracked failure; gateValidated:false keeps findMissingServices from flagging
it. Real serviceInstance IDs for both envs recorded from Railway GraphQL.
Regenerates railway-envs.generated.json and updates the service-count /
gate-ignored carve-out assertions (28->29 services).
Verified: live verify-railway-image-refs.ts now exits 0 ("54 env-scoped
instances verified, 2 skipped"); without the entry it exits 1 with the
harness-legacy untracked failure. Full scripts test suite green (1771 passed).
The pool-fleet cutover manually created the staging-only
`showcase-harness-worker` Railway service (HARNESS_ROLE=worker, 2
replicas) and flipped the existing `harness` service to
HARNESS_ROLE=control-plane. The new service was untracked in the SSOT,
so verify-railway-image-refs.ts failed the "Showcase: Build & Push"
workflow on every push to main (1 untracked Railway service), which
skipped the harness `build` job and blocked harness image rebuilds.
Add the worker to SERVICES as a staging-only, domain-less queue worker:
- ciBuilt:false — it runs the SAME `showcase-harness` image the existing
harness build slot produces; there is no separate worker build.
- gateIgnore:true / gateValidated:false — no prod instance and no public
domain, so it does not fit the symmetric dual-env shape the image-ref
gate validates. gateIgnore clears the "untracked Railway service"
failure (any SSOT entry counts as known) without tripping a false
"missing from prod" failure.
- repoNameOverride → showcase-harness so the image-ref shape resolves.
- probe disabled in both envs (no externally-reachable health endpoint).
Regenerate railway-envs.generated.json and update the SSOT-count and
gate-coverage test invariants (27→28 services; worker is the sole
intentional gateIgnore/gateValidated:false entry).
Distinguish ENOENT (treat as drift) from other read errors in
emit-railway-envs-json.ts --check; non-ENOENT errors now exit 2 with the
real error on stderr instead of being silently coerced into a misleading
'stale' message or an overwrite on a false drift signal.
Add a --out=<path> override so tests can write to a temp directory and
never mutate the tracked railway-envs.generated.json artifact. Rewrite
the emit-railway-envs-json test to use mkdtempSync + --out, switch the
staleness assertion to spawnSync so it asserts on exit code 1 plus the
stale-diagnostic substring, and add coverage for the new EISDIR
fail-loud path. After this change git status is clean post-test.
Adds Domains, ProbeDriver, ProbeConfig types + domainFor() helper that
throws on unknown service/env. Populates domains.{staging,prod} and
probe.{staging,prod,driver} on every SERVICES entry. Adds
emit-railway-envs-json.ts to serialize the SSOT for the Ruby side and
the workflow consumers.
Refs spec §3 / §3a.